Before policies and systems, a simple matrix answers the question that matters: what can go wrong, and how much it costs.
When a company starts thinking about governance, the temptation is to jump straight to policies, codes of conduct and systems. None of that works without the basic question: which risks actually matter here.
Without that answer, the integrity program protects against risks the company doesn't have and leaves exposed the ones it does.
What a risk matrix is
A table that lists the main business risks and rates them on two dimensions: likelihood of happening and impact if they happen. Crossing the two sets the priority — and, therefore, where to invest time and money in controls.
The concept is the same as ISO 31000 and COSO ERM, without the structure that only makes sense in a large company. An SME doesn't need a three-hundred-page methodology. It needs a spreadsheet that exists, has an owner and gets reviewed.
How to build it in one week
Days 1 and 2 — identification. Bring together the people responsible for each area and list, without filters, everything that can go wrong. Working through four categories avoids the most common blind spot, which is seeing only financial risk: operational, regulatory and compliance, financial and reputational.
Day 3 — the scale. Before scoring, write down in one line what each impact score means. Impact 5 might be a loss above R$ 500,000, suspension of an operating license or a production stoppage of more than a week. Without that scale, each manager scores on their own terms and the matrix stops comparing anything. This is also where the cost of risk shows up for the first time as a number, not an adjective.
Day 4 — rating and residual risk. Each item gets a score from 1 to 5 for likelihood and for impact. Then record the control that already exists today. High inherent risk with an effective control is not a priority; medium risk with no control at all may be. That difference is what guides the investment.
Day 5 — the plan. For the high/high quadrant, define an owner, a control, a deadline and a response: mitigate, transfer, avoid or accept. Accepting is a legitimate decision, as long as it is recorded and signed by someone with the authority to take it on.
What kills the matrix
Three things, in order of frequency:
Collective ownership. "Owner: Board" means no owner at all. A person's name, always. Preferably the risk owner (a manager or the key person who runs the activity or process).
No review date. A matrix without a defined review cycle ages in silence. Have it defined in a risk methodology: quarterly for critical risks, every six months for the rest, and an extraordinary review with every relevant change — new market, new regulation, acquisition, incident.
Disconnection from everything else. If the matrix doesn't shape the committee agenda, the audit plan and the indicators reported to leadership, it is a file, not a control.
The matrix doesn't need to be perfect — it needs to exist and be reviewed. It is the document that supports everything else: policies, control testing and indicators.
Would your risk matrix hold up in an audit? The initial assessment comes with no commitment.
We also invite you to take the self-assessment on our website, in less than 3 minutes, and we will contact you to analyze your case.